Flows, schedules and assignments
Complete and return an assigned activity
Use a disposable Operating Data Cube with two enrolled test accounts. For this example, assign the action to an application Editor and the review to its Administrator. Use their actual subject IDs when you prepare the Point A assignment. Publish the Input Uplift rule as the pinned artifact, save the Point A input review flow, then publish and start one exact occurrence.
- As the assignee, open Tasks in the application to reach My Work. Under Ready, choose Continue exact work on Check the input. Verify assignment
point-a-review, flowdocs.point-a-reviewversion1and the occurrence version. - Use Open governed destination to inspect the pinned
docs.input-upliftversion1and its digest. Use browser Back to return to the activity. Once you have checked the selected input, review the attestation under Reviewed actions, check the review box and choose Complete activity. Confirm the dialog and inspect the operation receipt. - As the reviewer, open Review the input check from My Work when it is ready. To exercise a return, enter
Please recheck the selected inputunder Return reason, check the review box and choose Return to configured predecessor. Confirm and verifyActivityReturnedin the Immutable activity timeline. - Have the assignee reopen and complete the returned activity. The reviewer can then reopen the ready review, attest and choose Complete activity. Verify
OccurrenceCompletedin the timeline. For a different activity that requires a receipt, use its exact operation ID in Authoritative operation receipt and inspect it before completing.
Save, publish and deactivate a rule schedule
As Administrator in the same disposable application, use Schedule a program to publish the exact generic application rule, create its active delegation and prepare the docs.daily-uplift version 1 schedule JSON. Set the first due time a day in the future so the example can be reviewed and deactivated before it runs.
- Open Rules and find Rule schedules. Choose Read schedules. Paste the prepared definition into Schedule definition JSON under Author and control, check Review exact save intent, choose Save and confirm. Look for
Savedand the receipt. - The current browser inspector opens published schedules. A saved draft can appear in the table while Open returns
INVALID_APPLICATION_SCHEDULE_RESPONSE. Use the exact MCP read and publish procedure for the saved version. Refresh the application revisions and review the target and active delegation before publication. - Reopen the application, return to Rule schedules and choose Read schedules. Choose Open on the
Publishedrow and verify the full definition. To stop future runs in this disposable example, check Review exact deactivate intent, choose Deactivate and confirm. Verify the deactivation receipt. The immutable definition remains available and the table showsSavedafter its active publication is removed.
For stale activity versions or changed assignments, reopen the exact work item and review the new state. For schedule changes, check separately for any work that was already admitted.