Open EPM ← Back to openepm.dev

Grid, POV and supporting detail

Open Grid in the disposable Operating Data Cube with at least Reader access. Expand Saved governed grid views, choose Refresh shared definitions, select Operating Entry and choose Open shared definition. If the definition is unavailable, choose Configure layout and set Account and Analysis Axis on rows and Period on columns.

  1. In Point of view, verify or select Point A, 2027, Input and Raw for Entity, Year, View and Value. Choose Read grid. The starting sample for Input A / Item A / Period 01 is 10.00000000.
  2. Open the cell to confirm the full coordinate and Current authoritative state. With write access on the disposable cell, choose Numeric amount and Set, enter 12.50000000 and check I reviewed this exact cell mutation. Choose Submit durable writeback and confirm the server preview.
  3. Keep the job ID and follow the Monitor procedure to inspect its publication receipt. Return to the same grid and choose Read grid. Verify the cell displays 12.50000000.

Supporting detail

To prepare this example in your disposable application, publish the sample lines for Period 02 from Inspect supporting detail. In Data, find Supporting detail and choose Read detail. Select Open on the row with Account: InputA, Custom01: ItemA and Period: P02. The Reviewed replacement editor shows Travel at 1.25000001 and Credit at -0.25000000. Reader access allows inspection of the lines.

Use a write-authorized MCP session to replace the lines. In the current browser build, Replace supporting detail sends an amount format that the preview rejects with V2_LINE_DETAIL_INVALID.

  1. Read the same full coordinate with facts.cube.scan and copy the numeric cell’s current numericChangeId. Reuse the sample’s exact facts.line-detail.replace request. Set both expected change IDs to that value for this seeded detail cell. Change the Travel amount string to "1.50000001" and keep Credit at "-0.25000000". The expected total is 1.25000001.
  2. Preview and submit the exact replacement. Keep the job ID and inspect its publication receipt in Monitor. If either change ID is stale, reread the coordinate and review the current lines before trying again.
  3. After publication, choose Read detail again and open the same row to verify the two lines. In the same Operating Entry grid and point of view, choose Read grid and verify Period 02 displays 1.25000001.

The fixed core validates and publishes the detail and total together.

Discussion

Discussing Grid, POV and supporting detail

The discussion service requires JavaScript and a connection to Firebase.